Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum alteration cost without full compliance50 pct
cost of the work as determined by the Building Permit does not exceed 50 percent of the assessed value of the structure in any 24-month period
- Cessation period for loss of nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. status180 days
the nonconforming use ceases for 180 days or longer
- Destruction threshold for loss of nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. status75 pct
destroyed by any means to more than 75 percent of the assessed value of the structure
From the ordinance
the nonconforming use ceases for 180 days or longer; destroyed by any means to more than 75 percent of the assessed value of the structure; cost of the work does not exceed 50 percent of the assessed value in any 24-month period