Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum interval between similar Temporary Use Permits30 days
A minimum of 30 days shall pass between the issuance of a new Temporary Use Permit and the expiration of a similar Temporary Use Permit for the same property, unless otherwise specified by Subsection D. above, or the actual removal of the materials and structures associated with the former use, whichever last occurs.
- Removal of materials and structures after termination10 days
All materials and structures associated with the temporary use shall be removed within 10 days from the actual termination of operations, or after the expiration of the Temporary Use Permit, whichever first occurs.
From the ordinance
All materials and structures associated with the temporary use shall be removed within 10 days from the actual termination of operations, or after the expiration of the Temporary Use Permit, whichever first occurs.