Dimensional standards
Servicing
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Engineering and hydraulic study required
In cases where structures, fences, levees, dikes or filling may increase the depth or velocity of flood on adjacent lands within the flood plain area, an engineering and hydraulic study shall be prepared.
From the ordinance
The F3 overlay district is applied to land within a 100-year flood plain.