Nevada County Unincorporated, California · General provision
Section 12.05.190.C
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Destruction threshold for repair50 percent
In cases where the destruction is less than fifty percent (50%) of the market value preceding destruction, the structure may be repaired.
- Maximum expansion percentage per 10 years5 percent
expansion shall be limited in any ten-year period to an increase of not more than five percent (5%) of the gross square footage
- Maximum repair expenditure as percentage of market value25 percent
total expenditure for labor and materials combined for such activity shall not exceed twenty-five percent (25%) of the fair market value
From the ordinance
The total expenditure for labor and materials combined for such activity shall not exceed twenty-five percent (25%) of the fair market value of the structure. The expansion shall be limited in any ten-year period to an increase of not more than five percent (5%) of the gross square footage of the structure. In cases where the destruction is less than fifty percent (50%) of the market value preceding destruction, the structure may be repaired.