Section M (Cannabis) - Setback Easements and Setback Variances
Dimensional standards
Servicing
- Geographic extent
- Cannabis cultivation standards applicable countywide
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Encouraged distance from sensitive uses600 ft
encourage any person proposing to construct or operate a new or relocated school, sensitive site, church, park, daycare, or child care center, or youth-oriented facility to consider whether the proposed location of such use is within six hundred (600') feet of a premises upon which cannabis cultivation is permitted
- Maximum setbackSetbackThe distance a building must be held back from a lot line. easement area40 pct
Setback easement area cannot exceed forty percent (40%) of the required setback
- Minimum distance from state/federal park300 ft
The proposed site is at least three hundred (300') feet from the property line of the State or Federal Park
- Minimum setbackSetbackThe distance a building must be held back from a lot line. for existing structures30 ft
existing structures permitted prior to May 1, 2019 shall be limited to a minimum setback of thirty (30') feet to property lines
- Minimum setbackSetbackThe distance a building must be held back from a lot line. varianceVariancePermission to depart from a specific dimensional rule, granted on a showing of hardship.60 ft
Setback variances shall be limited to a minimum setback of sixty (60') feet to property lines
From the ordinance
Setback variances shall be limited to a minimum setback of sixty (60') feet to property lines; provided, however, existing structures permitted prior to May 1, 2019 shall be limited to a minimum setback of thirty (30') feet to property lines.