Dimensional standards
Housing
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- SetbackSetbackThe distance a building must be held back from a lot line. measurement from high water mark
If there is an established 'high water' mark delineated through a state or federal jurisdictional agency, then that 'high water' controls for purposes of measuring the beginning point for the front yard or rear yard setback measurement. If no delineation has been made the setbacks shall be measured beginning from the top of the natural bank.
- Minimum court area400 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
such court shall contain a rectangular open area at least twenty (20) feet by twenty (20) feet in horizontal dimensions.
- Required fence along single-familySingle-family dwellingOne dwelling unit on its own lot, usually detached from its neighbours. zone
In any multifamily zone (including the CRR zone), in connection with any development other than a residential use of not more than three (3) dwelling units, an ornamental fence shall be provided along any property line of the subject property which abuts a single-family residential zone. Within the front yard area, such fence shall conform to the limitations and requirements for fences in front yards. Elsewhere, such fence shall be a solid fence not less than six (6) feet high and not more than seven (7) feet high.
From the ordinance
R-1 uses are permitted in the CRR Zone and the R-1 setbacks apply. All other uses in the CRR Zone require a Conditional Use Permit.