Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum construction completion to avoid expiration10 pct
less than ten (10) percent of the total cost of all construction ... has been completed
- Permit expiration period12 months
If, within twelve (12) months after issuance of such permits: ... less than ten (10) percent of the total cost ... has been completed
From the ordinance
Zoning, special use, conditional use, and sign permits shall expire automatically. If, within twelve (12) months after issuance ... less than ten (10) percent of the total cost ... has been completed ...