Napa County Unincorporated, California · General provision

18.119.210

Dimensional standards

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum cross-sectional area increase for modification25 pct

    The gross cross-sectional area or silhouette of the telecommunications tower involved with related antennas, dishes and other devices attached has not, from any aspect, been increased by more than twenty-five percent over that authorized by the original use permit

  • The overall height of the telecommunication tower with all planned antennas and other equipment attached has not been increased by more than ten feet over that authorized by the original use permit

  • Maximum trips per week for modification2 trips per week

    The modified facility will generate no more than two trips per week on an average annualized basis once all construction work is complete and all equipment installed is fully operational

From the ordinance

Modification of a previously-approved telecommunication facility may be authorized by site plan approval... The modified facility will generate no more than two trips per week... The overall height of the telecommunication tower with all planned antennas and other equipment attached has not been increased by more than ten feet... The gross cross-sectional area or silhouette of the telecommunications tower involved with related antennas, dishes and other devices attached has not, from any aspect, been increased by more than twenty-five percent...
18.119.210