Other
- Maximum aggregate cutGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. or fillGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.4 ft
No new cuts or fills would be higher than three feet individually or four feet in aggregate at any given location
- Maximum cutGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. or fillGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.3 ft
No new cuts or fills would be higher than three feet individually or four feet in aggregate at any given location
- Maximum effective radiated power for administrative approval10,000 watts
The facility is incapable of producing effective radiated power levels in excess of ten thousand watts
- Maximum new road length for administrative approval300 ft
Less than three hundred feet of new road has been (or would be) installed to serve the planned facility
- Maximum average slope for administrative approval30 pct
The areas disturbed have average slopes of under thirty percent
- Maximum tower heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for administrative approval (except multiple-user/co-located)150 ft
The height of any new telecommunications tower, other than a tower on a multiple-user site or co-located with a quasi-public facility, is less than one hundred fifty feet
- Maximum tower heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for multiple-user or co-located with quasi-public facility35 ft
The height of any new uncamouflaged or unscreened telecommunications tower on a multiple-user site or when co-located with a quasi-public facility shall be less than thirty-five feet
- Maximum tree diameter that may be removed6 inches
No trees larger than six inches in diameter have been (or would be) removed.
- Maximum trips per week for administrative approval1 trips per week
The facility will generate no more than one trip per week on an average annualized basis once construction is complete and the equipment is fully operational
From the ordinance
Establishment of a telecommunication facility may, where permitted under the provisions of Chapters 18.16 through 18.100, be authorized by a site plan approval pursuant to Chapter 18.140 so long as said facility meets all the following conditions: ... The areas disturbed have average slopes of under thirty percent; ... The facility is incapable of producing effective radiated power levels in excess of ten thousand watts; ... The facility will generate no more than one trip per week on an average annualized basis once construction is complete; ... The height of any new telecommunications tower, other than a tower on a multiple-user site or co-located with a quasi-public facility, is less than one hundred fifty feet; ... The height of any new uncamouflaged or unscreened telecommunications tower on a multiple-user site or when co-located with a quasi-public facility shall be less than thirty-five feet; ... Less than three hundred feet of new road has been (or would be) installed to serve the planned facility; ... No new cuts or fills would be higher than three feet individually or four feet in aggregate at any given location; ... No trees larger than six inches in diameter have been (or would be) removed.