Napa County Unincorporated, California · General provision

Chapter 18.124

Extracted standards

11 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Use permit expiration period2 years

    a use permit shall, without further action by any county officer or body, expire and become void two years after the date the approving officer or body orders the use permit issued

  • Groundwater impact finding required

    That, in the case of groundwater basins identified as 'groundwater deficient areas' under Section 13.15.010, the proposed use would not require a new water system or improvement, or utilize an existing water system or improvement causing significant adverse effects, either individually or cumulatively, on said groundwater basins in Napa County

  • Maximum average daily trips for minor modification40 ADT

    the total ADT from all uses exceeds forty ADT

  • Maximum building footprint increase for minor modification10,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.

    Any change in aggregate building footprint (including caves) by a maximum of 10,000 square feet or 25 percent of the total footprint

  • Any increase in aggregate building footprint (including caves) so long as the total does not exceed 5,000 square feet

  • Maximum size increase for minor modification25 pct

    the zoning administrator shall not consider or approve a minor modification if the result of the approval of the requested minor modification would result in any structure or the aggregate of all approved structures being increased more than 25 percent in size or one story in height

  • the zoning administrator shall not consider or approve a minor modification if the result of the approval of the requested minor modification would result in any structure or the aggregate of all approved structures being increased more than 25 percent in size or one story in height

  • Maximum wine production increase for minor modification30,000 gallons

    An increase in wine production up to a maximum of 30,000 gallons annually

  • Notice radius for minor modifications1,000 ft

    To all owners of real property, including businesses, corporations or other public or private entities, as shown on the latest equalized assessment roll within 1,000 feet of the real property that is the subject of the proposed zoning change.

  • The public officer or body authorized to consider applications for use permits shall issue or refuse to issue use permits only after holding a duly noticed public hearing.

  • Wait period for reapplication after revocation1 years

    no application for a use permit for the same or substantially the same use and design or use of the same or substantially the same site shall be filed within one year from the date of denial or revocation.

From the ordinance

A use permit may be granted by the commission subject to the provisions of this chapter, provided however, that if the board of supervisors is the decision maker on any companion action which is necessary to approve the use permit, the commission shall make an advisory recommendation to the board to approve or disapprove the entire action, and the board shall thereafter make the final decision on the entire action, including any determination to be made under the California Environment Quality Act (CEQA), in accordance with this chapter.
Chapter 18.124