Napa County Unincorporated, California · General provision
18.104.290
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Noise
- Noise barrier required
Construction of an effective masonry or other high-mass noise barrier at the setback between the equipment yard component and adjacent parcels not in agricultural preserve, agricultural watershed, or general industrial zoning district.
Other
- Utility service center screening setbackSetbackThe distance a building must be held back from a lot line.20 ft
Any screening must include a twenty-foot setback which is covered with a dense landscaping screen on the side and rear property lines.
From the ordinance
Equipment yard activities shall be screened from all streets... any screening must include a twenty-foot setback which is covered with a dense landscaping screen on the side and rear property lines of any utility service center that adjoins a parcel that is located within an IP zoning district.