Chapter 18.40
Dimensional standards
Lot
Height & bulk
- Minimum landscaping
- 20%
Uses
Permitted by right3
- Agriculture
- Minor antennas meeting requirements of Sections 18.119.240 through 18.119.260
- Telecommunication facilities meeting performance standards of Section 18.119.200 with site plan approval
Conditional / special use17
- Professional, financial, administrative or general business offices
- Research, development, design or testing laboratories
- Manufacturing and assembling of electrical, electronic or electro-mechanical devices
- Manufacturing, assembly, fabrication, warehousing and distribution of non-flammable goods
- Cooperage, bottling plants or wine warehousing and distributing facilities
- Machine shops or other light-metal working shops
- Ancillary daycare (as secondary use or stand-alone with conditions)
- Commercial renewable energy facilities
- Mini-storage
- Manufacturing, compounding, processing, packing, treating or storing of food stuffs, wineries, pharmaceuticals, toiletries
- Painting, lithography, cartography or bookbinding
- Snack bars/other food service as ancillary use
- Totally enclosed rifle and pistol ranges
- Other similar non-nuisance uses
- Telecommunication facilities not meeting performance standards
- Ancillary retail and personal service commercial uses (under special circumstances)
- Hotels, motels and conference centers (under special circumstances)
Extracted standards
13 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Lighting
- Lighting shielding
All exterior lighting shall be shielded or recessed such that the light source is not visible from off-site.
Other
- Building materials
All buildings shall be constructed of durable, permanent materials, either reinforced concrete and steel, masonry or wood-frame construction or structural equivalents. Prefabricated metal buildings are prohibited.
- Building setbackSetbackThe distance a building must be held back from a lot line. from arterials35 ft
From arterials: fifty-five feet average, thirty-five feet minimum
- Building setbackSetbackThe distance a building must be held back from a lot line. from Highway 2945 ft
From State Highway 29: fifty-five feet average, forty-five feet minimum
- Noise standard
All noise shall be muffled so as not to be objectionable due to intensity or periodicity. Maximum peak sound pressure levels when measured on the 'A' scale at the lot line shall not exceed a curve drawn through specified points.
- Outdoor storage screening
Any articles, goods, or materials authorized for storage outside of buildings shall be screened (fenced and landscaped) from view from adjacent sites, streets and/or other public use areas.
- Parking setbackSetbackThe distance a building must be held back from a lot line. from Highway 2945 ft
Minimum setbacks for new or expanded parking... from State Highway 29: forty-five feet
- Railroad line setbackSetbackThe distance a building must be held back from a lot line.35 ft
Where any boundary line of a parcel abuts a through railroad line, a thirty-five foot minimum building setback shall be maintained from the railroad right-of-way.
- SetbackSetbackThe distance a building must be held back from a lot line. from residential/agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.100 ft
Where any boundary line of a parcel adjoins property located within a residential or agricultural zoning district, a hundred-foot minimum building setback shall be maintained on the IP parcel unless there is a public roadway between the buildable areas.
- Tree removal replacement
Removal of any tree species over eight inches in circumference will require the planting of the same species of tree at a ratio equal to two times the caliper inches of the removed tree.
- Underground utilities
All utilities, laterals, mains, service line, trunk lines and the like, shall be underground.
Unobstructed development setback corridors shall be established and maintained along the following watercourses to facilitate movement of wildlife, to reduce the impacts of localized flooding, to provide visual amenities, to improve water quality and associated habitat.
Minimum setbacks of twenty-five feet as measured from the edge of the resource shall be required, unless a greater setback is recommended by the Department of Fish and Game.
From the ordinance
The IP zoning district is intended to accommodate light industrial uses such as office research and development, light manufacturing, light assembly, warehousing and distribution...