Section 21.92.090
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Reversion of land use designation if mitigation not completed
If the applicant does not submit evidence that the mitigation has been completed within twenty-four (24) months of the approval of the zoning change, the change in land use designation will revert to the prior land use designation.
- Mitigation completion deadline24 months
within twenty-four (24) months of the approval of the zone change or prior to commencement of use, whichever occurs first
- Mitigation required for land use change
Projects that change the land use designation of agriculturally designated land to non-agriculturally designated land shall be conditioned to provide the mitigation
- Mitigation required for permit or varianceVariancePermission to depart from a specific dimensional rule, granted on a showing of hardship. exceeding coverage
Projects that require a Use Permit or Administrative Permit or a variance where the maximum building site coverage is exceeded shall provide the Farmland Conservation Easement, Farmland Deed Restriction, payment of In-lieu Fees, or Alternative and Complementary Mitigation prior to or concurrent with the recordation of a parcel or final map or prior to issuance of the first construction permit, whichever occurs first.
From the ordinance
Projects that change the land use designation of agriculturally designated land to non-agriculturally designated land shall be conditioned to provide the mitigation within twenty-four (24) months of the approval of the zone change or prior to commencement of use, whichever occurs first.