Monterey County Unincorporated, California · General provision

21.64.120

Dimensional standards

Uses

Conditional / special use1

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

From the ordinance

Wind Energy Conversion Systems may be permitted in specified zoning districts subject to securing a the appropriate permits in each case, and subject to the following regulations: ... Setbacks: ... minimum setback of two times the height of the Wind Energy Conversion System from any property line. ... Noncommercial Wind Energy Conversion Systems shall not exceed a total height of fifty (50) feet unless the parcel on which the Wind Energy Conversion Systems is to be located is ten (10) acres or larger, in which case the maximum total height may be one hundred (100) feet. Commercial Wind Energy Conversion Systems shall not exceed a total height of two hundred (200) feet.
21.64.120