Sec. 20.134.010
Dimensional standards
Height & bulk
Servicing
- Applies within
- 2,640 ft
- Geographic extent
- Applied only to areas with R-L zoning designation within one-half mile of a legally established and active mining or mineral extraction operation. Not applied to land within any area of special flood hazard or land incorporated into AgriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. Preserves under Williamson Act contract.
Uses
Conditional / special use2
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Flood Hazard Area Exclusion
The Mineral Processing Combining District shall not be applied to land within any area of special flood hazard established in Section 22.17.210.
Other
- Cessation of Use After Mining Ceases1 year
When mining activity ceases, the mineral processing use must cease within one (1) year.
- Reclamation Plan Required
The batch plant site shall be reclaimed subject to a Reclamation Plan approved as part of the Use Permit approval provided for in Section 20.134.015. A Mining/Reclamation Plan describing the phasing of reclamation, in relation to the phases of the mining operation, shall be submitted for land areas which are to be included within a Mineral Processing Combining District.
- Williamson Act AgriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. Preserve Exclusion
The Mineral Processing Combining District shall not be applied to land incorporated into Agricultural Preserves under Williamson Act contract.
Overlay
- OverlayOverlay districtA second set of rules laid over the base district, adding requirements without replacing it. Removal Condition
When approving an MP use permit the County may include a condition of approval requiring the permittee to remove the MP zoning overlay upon expiration of the mining use permit.
From the ordinance
The operation of asphalt and concrete batch plants shall be allowed on properties within the Mineral Processing Combining District, subject to the issuance of a major use permit. ... asphalt silos and other mineral processing equipment are subject to the seventy-five (75) foot height limitation provided in Section 20.152.025(B)(3).