Mendocino County Unincorporated, California · General provision

Sec. 20.036.010

Uses

Conditional / special use1

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum off-site sale volume10 pct

    The sale of additional materials may be allowed for other off-site uses where such materials do not exceed ten (10) percent of that volume specified for the primary construction project.

  • Temporary processing requirement

    Except where conducted within a Mineral Processing Combining District, and subject to the requirement for a use permit, all such processing shall be of a temporary nature and carried on in conjunction with, and only for the duration of a specific construction project (except that portable screening and crushing equipment need not be related to a specific construction project).

From the ordinance

The mining and processing use type refers to places or plants primarily devoted to surface or subsurface mining... subject to the requirement for a use permit, all such processing shall be of a temporary nature...