Marin County Unincorporated, California · General provision

22.20.040.F

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Roosting bat protection required

    For the purposes of protecting roosting bats, outdoor construction activity that involves tree removal in an area where a biological assessment has identified a high probability of roosting bats on site are subject to the requirements enumerated below before and during site preparation and construction activities, unless separate project mitigation measures have been adopted that override these requirements. These standards apply only to tree removal that takes place during the nesting seasons of March 1 and April 15 or between September 1 and October 15.

From the ordinance

For the purposes of protecting roosting bats, outdoor construction activity that involves tree removal in an area where a biological assessment has identified a high probability of roosting bats on site are subject to the requirements enumerated below before and during site preparation and construction activities, unless separate project mitigation measures have been adopted that override these requirements. These standards apply only to tree removal that takes place during the nesting seasons of March 1 and April 15 or between September 1 and October 15.
22.20.040.F