Other
- Floor area ratioFloor area ratio (FAR)Total floor area divided by lot area — an FAR of 2.0 permits 20,000 sq ft of floor on a 10,000 sq ft lot. verification required2 pct
Floor area ratio verification is required if the floor area ratio resulting from a project would be within two percent of the maximum floor area ratio allowed for projects located on conventionally zoned properties.
- Building heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. verification required2 ft
Building height verification is required if the building height is within two feet of the maximum height allowed for projects located on conventionally zoned properties.
- SetbackSetbackThe distance a building must be held back from a lot line. verification required
Setback verification is required for setback distances when structural development is located up to or within one foot of the minimum required setback on conventionally zoned properties and when structural development is located within five feet of a property line, right-of-way, or access easement on planned district zoned properties.
From the ordinance
Setback verification is required for setback distances when structural development is located up to or within one foot of the minimum required setback on conventionally zoned properties and when structural development is located within five feet of a property line, right-of-way, or access easement on planned district zoned properties.