Madera, California · General provision

§ 10-3.406

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Abandonment period6 months

    If the nonconforming use ceases for a continuous period of six months, it shall be considered abandoned.

  • Reconstruction limit75 pct

    Reconstruction of damaged nonconforming building allowed if expense does not exceed 75% of appraised value.

From the ordinance

The lawful use of land only, existing on September 15, 1954, although such does not conform to the regulations specified in this chapter for the zone in which such land is located, may be continued provided no such use shall be enlarged or increased... If the nonconforming use of a building or structure ceases for a continuous period of six months, it shall be considered abandoned...
§ 10-3.406