Dimensional standards
Servicing
- Geographic extent
- Central traffic districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. or any business districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.; also in front of entrances to places of business or public assembly
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Bus zone establishment authority
The traffic and safety engineer is authorized to establish bus zones opposite the curb space for the loading and unloading of buses or common carriers of passengers.
- Loading/unloading permission applies only to commercial vehicles
Permission granted in this chapter to stop or stand a vehicle for purposes of loading or unloading of materials shall apply only to commercial vehicles
- Material loading zone curb color
Material-loading zones shall be indicated by yellow paint upon all curbs within such zones.
- Maximum time for loading/unloading materials20 min
in no event for more than 20 minutes.
- Maximum curb length for loading zones50 pct
In no event shall more than one-half of the total curb length in any block be reserved for loading zone purposes.
- Maximum time for passenger loading/unloading3 min
in no event for more than three minutes.
- Passenger loading zone curb color
Passenger-loading zones shall be indicated by white paint upon all curbs in such zones.
From the ordinance
Loading and bus zones regulations including curb markings, time limits, and establishment authority.