17.40.390

Heavy IndustrialAll Lancaster districts0

Dimensional standards

lot requirementsSTREETSTREETFront 20 ftSide 20 ftStreet side 20 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

20 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Floodplain

Other

  • Comprehensive review interval5 years

    A comprehensive review of the facility will be required after every 5 years.

  • All hazardous waste facility projects shall require a conditional use permit as set forth in Article I of Chapter 17.32.

  • Expiration if not commenced2 years

    If the applicant fails to commence operation of the facility within 2 years of the date of the land use decision, the conditional use permit shall expire.

  • Minimum separation from active fault200 ft

    No facility shall be placed within 200 feet of any known active earthquake fault or lineation suggesting the presence of a fault.

  • Fire department response capability

    All facilities shall locate in areas where fire departments are able to quickly respond to hazardous materials accidents and where demonstrated emergency response times are deemed acceptable by the local fire department official.

  • The minimum setbacks shall be 20 feet for front and street side yards.

  • Avoidance of rapid geologic change areas

    All facilities shall avoid locating in areas of potential rapid geologic change, or areas with high rate of subsidence and areas subject to liquefaction unless containment structures are designed, constructed and maintained in a manner acceptable to the director of public works and/or the city engineer so as to preclude failure as a result of such changes.

  • Maximum permit duration10 years

    The duration of the land use decision will be determined at the time of conditional use permit approval but shall not exceed 10 years.

  • Maximum renewal period10 years

    The conditional use permit may be renewed for an additional time period not to exceed 10 years

  • Prohibition in recreation/cultural/aesthetic areas

    All facilities shall be prohibited in areas of recreation, cultural or aesthetic value, as determined by the director.

  • Minimum separation from sensitive uses2,000 ft

    No facility shall be permitted within 2,000 feet of residential zoned sites, hospital sites, school sites or sites planned for immobile populations unless the applicant proves through a risk analysis that a 2,000 foot buffer zone is not required to protect public health and safety.

  • Adequate sewer capacity required

    Facilities generating wastewater shall be located in areas with adequate sewer capacity and treatment capability to accommodate the expected wastewater discharge.

  • The minimum setbacks shall be 20 feet for front and street side yards.

  • Truck route restrictions

    All facilities shall be located so that distance traveled on city streets is kept to a minimum, and any routes to and from state or interstate highways to or from the facility are used primarily by trucks, and the number of nonindustrial structures (homes, hospitals, schools, etc.) along such routes is minimal.

  • No variance shall be granted to the requirements or conditions set forth in this article.

  • All hazardous waste facilities shall erect a minimum 8-foot high decorative block wall that shall not exceed 15 feet in height.

  • All hazardous waste facilities shall erect a minimum 8-foot high decorative block wall that shall not exceed 15 feet in height.

  • The wall shall be set back at least 20 feet from the property line when located on street or highway frontage.

  • Minimum separation from water sources500 ft

    No facility shall be placed within 500 feet of a dry wash or river, aqueduct, reservoir, supply well, or aquifer recharge area or within any area known or suspected on basis of a geological study to be supplying recharge to an aquifer unless design features are incorporated to avoid any potential for water contamination.

From the ordinance

Facilities shall be located in areas designated on the general plan land use map as heavy industrial, and shall only be permitted in the HI zone. No facility shall be permitted within 2,000 feet of residential zoned sites, hospital sites, school sites or sites planned for immobile populations unless the applicant proves through a risk analysis that a 2,000 foot buffer zone is not required to protect public health and safety.