Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Processing facility conditional useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. permit required
A conditional use permit shall be required for a processing facility.
- Processing facility enclosed
The facility shall be enclosed within a building.
- Processing facility setbackSetbackThe distance a building must be held back from a lot line.50 ft
The facility shall be set back a minimum of 50 feet from all property lines.
- Processing facility zone
The facility shall be located in an industrial zone.
From the ordinance
The facility shall be located in an industrial zone. The facility shall be enclosed within a building. The facility shall be set back a minimum of 50 feet from all property lines. A conditional use permit shall be required for a processing facility.