York County Unincorporated, Virginia · General provision

Sec. 24.1-251 to 24.1-256

Dimensional standards

Servicing

Geographic extent
Applies to all new development with traffic generation thresholds and access management on various street classifications.

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Access exception15 pct

    reductions in the road frontage requirements shall not be greater than fifteen percent (15%)

  • Access on major arterial

    Each development shall be entitled to one (1) access to the street... A second access point... may be permitted where the total frontage along the major arterial exceeds six hundred feet (600').

  • Access on major collector

    Each two (2) newly created abutting non-residential lots shall be entitled to one (1) entrance... Lots with greater than three hundred feet (300') of frontage on a single road shall be entitled to an unshared entrance

  • Access on minor arterial

    Each development shall be entitled to one (1) access to the street... A second access point... may be permitted where the total frontage along the minor arterial exceeds four hundred feet (400').

  • Access on minor collector

    Each lot (either existing or newly created) shall be entitled to one (1) entrance... Lots with greater than three hundred feet (300') of frontage on a single road shall be entitled to two (2) entrances.

  • Bicycle and pedestrian accommodations

    Bicycle and pedestrian accommodations shall be provided in all developments anticipated to have at least twenty-five (25) employees on any shift or five hundred (500) average daily trips.

  • The minimum distance between the property line of a parcel and the nearest edge of the nearest driveway to that property line shall be twenty-five feet (25')

  • Driveway spacing50 ft

    Driveways shall be spaced at least fifty feet (50') apart.

  • On-site queuing area5 pct

    There shall be sufficient on-site queuing area to accommodate at least five percent (5%) of the total traffic volume entering and exiting the site during the peak hour

  • Sidewalk width6 ft

    The minimum width for sidewalks connecting to abutting property shall be six feet (6') and the sidewalk shall be located within an easement or on commonly owned property no less than eighteen feet (18') in width.

  • Traffic impact analysis threshold1,000 trip ends

    equals or exceeds one thousand (1,000) trip ends or where the traffic volume during a peak hour equals or exceeds one hundred (100) trip ends

Parking

  • TDM parking credit25 pct

    a credit may be granted by the zoning administrator of up to twenty-five percent (25%) of the required off-street parking expected to be utilized by employees... The maximum credit which may be given the Transportation Demand Management programs in concert with other credits is thirty-five percent (35%) of the required off-street employee parking requirements plus ten percent (10%) of the customer or patron spaces.

  • Transit parking reduction5 pct

    Off-street parking requirements may be reduced by five percent (5%) when transit provisions are required to be constructed.

From the ordinance

Any residential, commercial, industrial use... where the anticipated average weekday twenty-four (24) hour traffic generation... equals or exceeds one thousand (1,000) trip ends or where the traffic volume during a peak hour equals or exceeds one hundred (100) trip ends
Sec. 24.1-251 to 24.1-256