York County Unincorporated, Virginia · General provision

Sec. 24.1-243 (Transitional buffers)

Dimensional standards

Servicing

Geographic extent
Applies to transitional buffers along zoning districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. boundaries, with modifications based on adjacent street right-of-way width and land use.

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Berm reduction25 pct

    the zoning administrator may authorize up to a twenty-five percent (25%) reduction in the required buffer width.

  • Buffer width reduction industrial-residential25 pct

    The required buffer width may be modified by up to twenty-five percent (25%) through administrative approval... in no case shall the planting ratio be less than that required for a Type 35 buffer.

  • Buffer width reduction other situations20 ft

    the required transitional buffer may be reduced to one-half (½) the normally required width, or twenty feet (20'), whichever is greater... planting ratio not less than that required for a Type 25 Buffer.

  • Buffer waiver for wide right-of-way90 ft

    Where the zoning district boundary line which requires a transitional buffer follows a public street or highway right-of-way ninety feet (90') or greater in width, no transitional buffer shall be required.

  • Utilities in transitional buffer

    Aboveground or underground utilities shall not be located within transitional buffers except those which cross the buffer at a right angle.

From the ordinance

Aboveground or underground utilities shall not be located within transitional buffers except those which cross the buffer at a right angle.
Sec. 24.1-243 (Transitional buffers)