Sec. 24.1-115
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Deferral expiration period1 years
if the applicant does not request that the application move forward for consideration by the board within one (1) year from the date of the Commission public hearing, then such application shall become null and void
- Discontinuance period causing termination2 years
Where any special use or conforming special use is discontinued for any reason for a continuous period of two (2) years or more, the special use permit shall automatically terminate
- Time to establish special useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote.2 years
failure to establish the special use authorized by the permit within two (2) years from the date of approval by the board shall cause the permit to terminate automatically
- Initial term of special use permitConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote.1 years
the initial term of each special use permit shall be for one (1) year from the date of approval
- Maximum cumulative increase for minor amendment25 pct
There will be a cumulative total of less than a twenty-five percent (25%) increase in either total lot coverage or floor area
- Maximum increase for non-material modification5 pct
there will be a five percent (5%) or less increase in either lot coverage or floor area over what was originally approved
- Wait period after denial1 years
no other application for substantially the same request shall be considered until one (1) year has elapsed from the date of the board's action
From the ordinance
Unless otherwise specified by the conditions of the permit or as set forth in subsection (c)(6) below, failure to establish the special use authorized by the permit within two (2) years from the date of approval by the board shall cause the permit to terminate automatically.