Sec. 66-167
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. activity damage threshold50 pct
cost of restoration... exceed 50 percent of the cost of reconstructing the entire activity or structure
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structure damage threshold25 pct
If a nonconforming structure is destroyed or damaged in any manner to the extent that the cost of restoration to its condition before the occurrence shall exceed 25 percent of the cost of reconstructing the entire structure, it shall be restored only if it complies with the requirements of this chapter.
- Repair completion period18 months
any such repair or restoration is started within 12 months and completed within 18 months from the date of partial destruction.
- Repair start period12 months
any such repair or restoration is started within 12 months and completed within 18 months from the date of partial destruction.
From the ordinance
If a nonconforming activity is destroyed or damaged in any manner, to the extent that the cost of restoration to its condition before the occurrence shall exceed 50 percent of the cost of reconstructing the entire activity or structure, it shall be restored only if such use complies with the requirements of this chapter.