Warsaw, Virginia · General provision

Section 4-8

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Above-ground exemption for electric transmission lines50 kV

    Electric transmission lines and facilities in excess of fifty (50) kilovolts are permitted above ground.

  • Underground utilities required for major plans

    All utility facilities proposed within major plans of development, including but not limited to wires, cables, pipes, conduits and appurtenant equipment, shall be placed underground.

From the ordinance

All utility facilities proposed within major plans of development shall be placed underground. Exemptions for electric transmission lines in excess of 50 kV.
Section 4-8