Warsaw, Virginia · General provision

Section 4-7

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Any land disturbance in excess of 2,500 square feet may result in soil erosion from water or wind and the movement of sediments into State waters.

  • Plan approval period45 days

    The County Land Use Administrator shall, within 45 days, approve any erosion and sediment control plan submitted to him if he determines that the plan meets the conservation standards.

  • Plan map scale

    The plan map shall be prepared at a scale of not less than 1" = 100' or as accepted by the County Land Use Administrator.

From the ordinance

Erosion and sediment control. Any land disturbance in excess of 2,500 square feet may result in soil erosion. Plan approval within 45 days. Plan scale 1"=100'.
Section 4-7