Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Grading
- Minimum gradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. setbackSetbackThe distance a building must be held back from a lot line. from perennial watercourse or wetland100 ft
No grading shall occur within 100 feet of any perennial watercourse or wetland
From the ordinance
No grading shall occur within 100 feet of any perennial watercourse or wetland except as provided for specific waterfront erosion control, water-dependent facilities or for necessary utilities and street construction.