Warren County Unincorporated, Virginia · General provision
§ 180-46.7
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Hours of operation
Operation of such use shall be limited to Monday through Friday between the hours of 7:30 a.m. and 5:00 p.m.
- Minimum acreage for firewood processing5 acresacre43,560 square feet — about the size of an American football field without the end zones.
The minimum acreage for a firewood processing operation shall be five acres.
- SetbackSetbackThe distance a building must be held back from a lot line. from residential property line500 ft
No such use shall be established closer than 500 feet to any existing residential property line.
- SetbackSetbackThe distance a building must be held back from a lot line. from property line for structures/storage100 ft
No structure and no storage of lumber, logs, chips or timber shall be located closer than 100 feet to any property line.
From the ordinance
The minimum acreage for a firewood processing operation shall be five acres.