§ 180-55.3
Uses
Permitted by right1
Conditional / special use1
Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Property boundaries must be clearly marked
Property boundaries, or limitations within the property's boundaries where attendees are allowed, must be clearly marked at all times.
- Hours of operation per CUP
The hours of operation shall be specified in the conditions placed on the conditional use permit.
- Maximum occupants
The maximum number of occupants/participants shall be determined by approved permits received by the Warren County Health Department and shall be specified in the conditions placed on the conditional use permit.
- Number of outdoor sites based on lot size
Lots equal to or greater than two acres but less than five acres: no more than one outdoor site; 5-10 acres: two; 10-20 acres: three; 20+ acres: five.
- Outdoor site location
Outdoor site locations shall be in the side or rear yard.
- Maximum outdoor site size400 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
No outdoor site shall occupy more than 400 square feet.
- Outdoor site setbackSetbackThe distance a building must be held back from a lot line. from property line50 ft
Outdoor site locations shall be 50 feet from any property line and/or 100 feet from any neighboring dwelling.
- Overnight stays permitted
Overnight stays may be permitted; occupancy is determined by Subsection B.
- Zoning permit required
The property owner and/or operator of the retreat center shall apply for and receive a zoning permit from the Planning Department prior to operation.
Parking
- Parking in driveways or designated areas
Parking for the use shall be in driveways or other designated and approved parking areas. The parking of vehicles is prohibited in or along all rights-of-way and in yards.
From the ordinance
The property owner and/or operator of the retreat center shall apply for and receive a zoning permit from the Planning Department prior to operation.