Warren County Unincorporated, Virginia · General provision

§ 180-46.7

Dimensional standards

lot requirementsSTREETMIN LOT AREA5 ac
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Adjacent to state-maintained road

    Proposed sites for such activities shall be adjacent to and have access to a state-maintained road.

  • Hours of operation

    Operation of such use shall be limited to Monday through Friday between the hours of 7:30 a.m. and 5:00 p.m.

Setback

From the ordinance

The minimum acreage for a firewood processing operation shall be five acres. No structure and no storage of lumber, logs, chips or timber shall be located closer than 100 feet to any property line. No such use shall be established closer than 500 feet to any existing residential property line. Operation of such use shall be limited to Monday through Friday between the hours of 7:30 a.m. and 5:00 p.m.
§ 180-46.7