Warren County Unincorporated, Virginia · General provision

§ 180-65A(1)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Zoning permit required before construction

    No business, structure to house a permitted use or use permissible by conditional use permit shall be conducted, constructed or excavation or grading therefor begun before the issuance of a zoning permit by the Zoning Administrator.

From the ordinance

No business, structure to house a permitted use or use permissible by conditional use permit shall be conducted, constructed or excavation or grading therefor begun before the issuance of a zoning permit by the Zoning Administrator.
§ 180-65A(1)