Warren County Unincorporated, Virginia · General provision

§ 180-65

Extracted standards

8 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Appeal of Planning Commission decision10 days

    The owner, owners or their agents may appeal the decision of the Commission to the Board within 10 days after the decision of the Commission.

  • Board ratification deadline60 days

    The Zoning Administrator shall issue a zoning permit following approval by the Planning Commission. Said approval shall be subject to ratification by the Board of Supervisors. Failure of the Board to act within 60 days of the date of transmittal of approving action of the Commission shall constitute ratification.

  • In addition to the required drawing, no new principal structure, located on a lot two acres in size or less, shall be constructed beyond the foundation stage until such time as the builder has submitted to the Zoning Administrator a plat, prepared by a certified land surveyor, certifying the location of the foundation wall and all structural projections on the property.

  • Planning Commission approval deadline60 days

    Failure of the Commission to act within 60 days of such submission, unless such time shall be extended by the Board, shall be deemed approval.

  • Planning Commission review of public areas

    No street or connection to an existing street, park or other public area, public building or public structure, public utility facility or public service corporation facility other than railroad facility, whether publicly or privately owned, shall be constructed, established or authorized, until the general location or approximate location, character and extent thereof has been submitted to and approved by the Planning Commission as being substantially in accord with the adopted Comprehensive Plan or part thereof.

  • Zoning permit application requirements

    An application for a zoning permit shall be made to the Zoning Administrator on forms to be provided by the Zoning Administrator who shall require and be furnished with all such plans and documents as may be needed to determine whether the proposed structure and facilities will be in compliance with the provisions of this chapter. Each such application for a zoning permit shall be accompanied by the following items or as much thereof as the Zoning Administrator deems applicable: (a) A certificate from the Health Official that the proposed location meets the requirements of the Health Department from the standpoint of water supply and sewage disposal or, where a public water and/or sewage system is involved, a statement from the appropriate authority that all applicable regulations and requirements are in compliance. (b) A land-disturbing permit to be issued pursuant to § 150-9 of Chapter 150, Soil Erosion and Sedimentation Control, of the Warren County Code. (c) The proposed use. (d) The number of families or housekeeping units. (e) An adequately dimensioned drawing unless otherwise specified. (f) The number, size, location and lighting of signs. (g) Off-street parking and other facilities.

  • Zoning permit required

    No business, structure to house a permitted use or use permissible by conditional use permit shall be conducted, constructed or excavation or grading therefor begun before the issuance of a zoning permit by the Zoning Administrator.

  • Zoning permit time limit6 months

    Any zoning permit issued shall become invalid if the authorized work is not commenced within six months of the date of issuance or is suspended or abandoned for a period of six months.

From the ordinance

No business, structure to house a permitted use or use permissible by conditional use permit shall be conducted, constructed or excavation or grading therefor begun before the issuance of a zoning permit by the Zoning Administrator.
§ 180-65