Virginia Beach, Virginia · General provision

Sec. 225.02

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Time to remove facility after abandonment365 days

    Within three hundred sixty-five (365) days of the date of abandonment, the owner or operator shall complete the physical removal of the battery storage facility.

  • Category VI landscape screening shall be required within the setback. No other uses or structures shall be permitted in the setback.

Setback

From the ordinance

A one-hundred-foot setback for buildings and battery cabinet containers shall be required along all lot lines. Category VI landscape screening shall be required within the setback.
Sec. 225.02