Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Time to remove facility after abandonment365 days
Within three hundred sixty-five (365) days of the date of abandonment, the owner or operator shall complete the physical removal of the battery storage facility.
- Landscape screening within setbackSetbackThe distance a building must be held back from a lot line.
Category VI landscape screening shall be required within the setback. No other uses or structures shall be permitted in the setback.
Setback
- SetbackSetbackThe distance a building must be held back from a lot line. for buildings and battery cabinets from lot lines100 ft
A one-hundred-foot setback for buildings and battery cabinet containers shall be required along all lot lines.
From the ordinance
A one-hundred-foot setback for buildings and battery cabinet containers shall be required along all lot lines. Category VI landscape screening shall be required within the setback.