Virginia Beach, Virginia · General provision

Sec. 239.02

Dimensional standards

lot requirementsSTREETMIN LOT AREA5 ac
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

Use

  • Must be with active farming

    Such facilities may be operated only in conjunction with an active farming operation on the site.

From the ordinance

Mulch processing facilities. (a) Minimum lot area shall be five (5) acres; (b) No machinery shall be operated between 7:00 p.m. and 7:00 a.m.;
Sec. 239.02