Virginia Beach, Virginia · General provision

Sec. 231

Uses

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Enclosed storage

    All materials to be recycled shall be stored within a fully enclosed building.

  • Operation restriction

    Operation of the collection depot shall be restricted to the collection or redemption of recyclable materials. Collected materials may be packaged for shipment and temporarily stored until transported to a separate processing facility. Operation of the collection depot shall not include the on-site processing of recyclable materials.

From the ordinance

Where a conditional use permit is issued for a collection depot for recyclable materials, all materials to be recycled shall be stored within a fully enclosed building. Operation of the collection depot shall be restricted to the collection or redemption of recyclable materials.
Sec. 231