- Decommissioning plan required
Each application for a conditional use permit for a battery storage facility shall include a decommissioning plan, which shall include the anticipated life of the project, contact information, timeline, and procedures.
- Fire monitoring
An onsite fire monitoring system or fire watch prevention plan as required by the fire chief of the City of Virginia Beach.
- Removal timeline365 days
Within three hundred sixty-five (365) days of the date of abandonment, the owner or operator shall complete the physical removal of the battery storage facility.
- Category VI landscape screening
Category VI landscape screening shall be required within the setback. No other uses or structures shall be permitted in the setback.
Setback
- SetbackSetbackThe distance a building must be held back from a lot line. from lot lines100 ft
A one-hundred-foot setback for buildings and battery cabinet containers shall be required along all lot lines.
From the ordinance