Virginia Beach, Virginia · General provision

Sec. 225.02

Uses

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Decommissioning plan required

    Each application for a conditional use permit for a battery storage facility shall include a decommissioning plan, which shall include the anticipated life of the project, contact information, timeline, and procedures.

  • Fire monitoring

    An onsite fire monitoring system or fire watch prevention plan as required by the fire chief of the City of Virginia Beach.

  • Removal timeline365 days

    Within three hundred sixty-five (365) days of the date of abandonment, the owner or operator shall complete the physical removal of the battery storage facility.

  • Category VI landscape screening

    Category VI landscape screening shall be required within the setback. No other uses or structures shall be permitted in the setback.

Setback

From the ordinance

A one-hundred-foot setback for buildings and battery cabinet containers shall be required along all lot lines. Category VI landscape screening shall be required within the setback. No other uses or structures shall be permitted in the setback.
Sec. 225.02