Dimensional standards
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Temporary sign maximum area in other districts32 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Within all other districts, a total of thirty-two (32) square feet of temporary signage shall be allowed on a lot.
- Temporary sign maximum area in residential/preservation districts16 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Within a Preservation, Agricultural, Residential, Apartment, or Historic and Cultural District, or a noncommercial area of a PD-H1 or PD-H2 Planned Development District, a total of sixteen (16) square feet of temporary signage shall be allowed on a lot.
- Temporary sign maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.8 ft
No such sign shall be higher than eight (8) feet above grade directly below such sign.
From the ordinance
Within a Preservation, Agricultural, Residential, Apartment, or Historic and Cultural District, or a noncommercial area of a PD-H1 or PD-H2 Planned Development District, a total of sixteen (16) square feet of temporary signage shall be allowed on a lot. Within all other districts, a total of thirty-two (32) square feet of temporary signage shall be allowed on a lot. No such sign shall be higher than eight (8) feet above grade directly below such sign.