Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Underground utilities
All new transmission, distribution and customer service utility facilities, carrying or used in connection with electric power, telephone, telegraph, cable television, petroleum, gas or steam, installed within the boundaries of any subdivision, the final plat of which is approved subsequent to April 28, 1969, shall be placed below the surface of the ground; provided that equipment such as electric distribution transformers, switchgear, meter pedestals and telephone pedestals, which is normally installed above ground in accordance with accepted utility practices for underground distribution, may be so installed; meters, service connections and similar equipment normally attached to the outside wall of the premises it serves may be so installed; and temporary overhead facilities required for construction purposes will be permitted.
From the ordinance
All new transmission, distribution and customer service utility facilities, carrying or used in connection with electric power, telephone, telegraph, cable television, petroleum, gas or steam, installed within the boundaries of any subdivision, the final plat of which is approved subsequent to April 28, 1969, shall be placed below the surface of the ground; provided that equipment such as electric distribution transformers, switchgear, meter pedestals and telephone pedestals, which is normally installed above ground in accordance with accepted utility practices for underground distribution, may be so installed; meters, service connections and similar equipment normally attached to the outside wall of the premises it serves may be so installed; and temporary overhead facilities required for construction purposes will be permitted.