Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Fire hydrants required
Fire hydrants shall be installed in all subdivisions.
- Sanitary sewer connection required
Sanitary sewer systems shall be connected to the Town sanitary sewer system, and each lot within a subdivision shall be connected to the sanitary sewer system.
- Dedication of lot frontageFrontageThe length of a lot line that touches a public street. for sidewalks
The developer of any lot shall dedicate land along the lot frontage for sidewalk, curb, and gutter improvements as shown on the adopted Town Pedestrian Plan.
- Storm drainage control
Adequate provisions shall be made for the control of storm runoff. All storm drainage shall terminate in an approved watercourse. The connecting of any part of the storm drain system to any part of the sanitary sewer system is prohibited.
- Street trees and public plantings
Trees and plantings within the right-of-way shall be approved by the Director of Public works and the Director of Parks and Recreation and installed at the cost of the subdivider.
- Utilities below ground
All new transmission, distribution and customer service utility facilities... shall be placed below the surface of the ground.
- Water connection required
The subdivider shall connect with the Town water mains and provide a water connection for each lot within the subdivision.
From the ordinance
The subdivider shall connect with the Town water mains and provide a water connection for each lot within the subdivision. Sanitary sewer systems shall be connected to the Town sanitary sewer system.