Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Condition: required during reconstruction after disaster
such temporary use is required during the reconstruction of a dwelling located in the Town, and that the dwelling formerly occupied by said residents has been destroyed or rendered uninhabitable by fire or other disaster not willfully caused by such residents.
- Maximum duration for temporary residential trailer6 months
the Town Council may authorize the temporary use of a trailer or mobile home as a dwelling for a period not to exceed six (6) months...
From the ordinance
the Town Council may authorize the temporary use of a trailer or mobile home as a dwelling for a period not to exceed six (6) months...