Section (q) Special Provisions Applicable to Data Centers

Dimensional standards

Extracted standards

8 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Noise

  • Mechanical equipment sound mitigation

    All mechanical equipment, both on ground and roof-mounted equipment, shall be attenuated through sound mitigation measures including, but not limited to, sound muffling materials.

  • Post-development noise evaluation within 90 days and annually for 10 years90 days

    Post-development noise conditions at the site will be evaluated and compared to local code requirements within ninety (90) days after the issuance of the occupancy permit for each phase of the project, and annually thereafter for a period of ten (10) years.

  • Sound propagation studies required

    A series of sound propagation studies shall be submitted as outlined herein.

Other

From the ordinance

All primary structures shall be set back at least one hundred (100) feet from any property line abutting non-commercial or non-industrial zoned properties for sites located within the urban services area, and at least two hundred (200) feet for sites outside.
Section (q) Special Provisions Applicable to Data Centers