Sec. 28-273
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Flood overlayOverlay districtA second set of rules laid over the base district, adding requirements without replacing it. compliance
any work done to repair, rebuild or replace such building or structure shall be in compliance with the provisions of the flood overlay district.
Other
- Damage repair period2 years
Unless such building or structure is repaired, rebuilt or replaced within two (2) years of the date of the natural disaster...
- Damage threshold for restoration50 pct
If such building or structure is damaged greater than fifty (50) percent and cannot be repaired, rebuilt or replaced to eliminate or reduce the nonconforming features, the owner may restore it to its original nonconforming condition...
- Enlargement requires conformance
A nonconforming building or structure shall conform to current zoning regulations whenever the square footage is enlarged or structurally altered.
- Move requires conformance
If a nonconforming structure is moved for any reason, and for any distance, it shall thereafter, upon relocation, conform to the current regulations for the zoning district in which it is relocated.
From the ordinance
A nonconforming building or structure... shall conform to current zoning regulations whenever the square footage of a building or structure is enlarged, or the building or structure is structurally altered...