South Hill, Virginia · General provision

Article XVI, Sec. 94.1-370 through 94.1-375

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Reconsideration period after denial12 months

    substantially the same petition will not be reconsidered within a period of one year from the date of the original denial

  • Special exception business cessation period90 days

    ceases to continue, whether voluntarily or involuntarily, for a period of 90 days or more, the special exception permit shall lapse

  • Special exception construction initiation period18 months

    lapse and be of no effect if the structure is not constructed or use initiated within 18 months of the date of issuance of the permit

  • Site plan required for special exception

    Special exception permit applications shall be accompanied by copies of a preliminary site plan as required by and prepared pursuant to requirements of article X.

Signage

  • Minimum notice sign dimensions18 in

    a sign having dimensions of not less than 18 inches by 24 inches

From the ordinance

The special exception for any use of structure authorized under the provisions of this section shall lapse and be of no effect if the structure is not constructed or use initiated within 18 months of the date of issuance of the permit.
Article XVI, Sec. 94.1-370 through 94.1-375