South Hill, Virginia · General provision
Article XVI, Sec. 94.1-370 through 94.1-375
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Reconsideration period after denial12 months
substantially the same petition will not be reconsidered within a period of one year from the date of the original denial
- Special exception business cessation period90 days
ceases to continue, whether voluntarily or involuntarily, for a period of 90 days or more, the special exception permit shall lapse
- Special exception construction initiation period18 months
lapse and be of no effect if the structure is not constructed or use initiated within 18 months of the date of issuance of the permit
- Site plan required for special exception
Special exception permit applications shall be accompanied by copies of a preliminary site plan as required by and prepared pursuant to requirements of article X.
Signage
- Minimum notice sign dimensions18 in
a sign having dimensions of not less than 18 inches by 24 inches
From the ordinance
The special exception for any use of structure authorized under the provisions of this section shall lapse and be of no effect if the structure is not constructed or use initiated within 18 months of the date of issuance of the permit.