- Letter of intent to annex required
A letter of intent to annex the house to the land must be submitted with the application.
- Masonry foundation completion time60 days
A masonry foundation is preferred and it shall be completed within 60 days after issuance of certificate of occupancy.
- Manufactured homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. occupant must own land
The occupant must own the land.
- Roof must be shingled and pitched
The roof is to be shingled and pitched.
- Siding material approval required
Any siding material other than vertical metal shall require approval by the building official.
- Steps and landings required
Front and/or rear steps and landings shall be provided as required to meet state law.
- Title must be returned to DMV
The title shall be returned to the Division of Motor Vehicles.
- Underskirting required
Underskirting continued to ground shall be installed and it shall be of the same material as the siding or compatible thereto.
- Wheels and tongue must be removed
The wheels and tongue must be removed.
From the ordinance
The installation of double-wide or multiunit manufactured housing must comply with the following: ... The wheels and tongue must be removed. ... Underskirting continued to ground shall be installed ... A masonry foundation is preferred and it shall be completed within 60 days after issuance of certificate of occupancy. ... The roof is to be shingled and pitched. ... Any siding material other than vertical metal shall require approval by the building official.