Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Front yardYardThe open space left between a building and its lot line — the space a setback creates. measured from future street line
required front yard measured from future street line when widening planned
From the ordinance
the required front yard set forth in this chapter shall be measured from the future street line.