Dimensional standards
Lot
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of canopies over fuel pumps from street ROW15 ft
Canopies over fuel pumps shall be set back at least 15 feet from the street right-of-way line
- Minimum fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for cell tower6 ft
The tower shall be enclosed by a fence of at least six feet in height
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of cell tower from lot lines and dwellings
The tower shall be set back a distance equal to the height of the tower from all lot lines and from any dwelling unit
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of fuel pumps from lot line15 ft
and at least 15 feet from any lot line
- Minimum setbackSetbackThe distance a building must be held back from a lot line. of fuel pumps from street ROW20 ft
Fuel pumps shall be set back at least 20 feet from the street right-of-way line
- Minimum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built. for gas station20,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The minimum lot area shall be 20,000 square feet
- Minimum lot frontageFrontageThe length of a lot line that touches a public street. for gas station100 ft
The minimum lot frontage shall be 100 feet
From the ordinance
Communication towers and cell towers shall be permitted as a conditional use in all districts except the M-1 District, where they shall be permitted... Gas stations and convenience stores with gas shall be permitted as a conditional use in the B-1 District and as a permitted use in the B-2, B-4, DR-1, and M-1 Districts...