Purcellville, Virginia · General provision

Sec. 7.1

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Adequate outfall contributing area ratio100 ratio

    A receiving channel may also be considered adequate at any point where the total contributing acreage is at least 100 times greater than the drainage area of the development site in question

  • Adequate outfall design storm2 year

    Adequate outfall means a natural or manmade channel or pipe capable of conveying the runoff from a two-year design storm without overtopping its banks or eroding after development of the site in question.

From the ordinance

Adequate outfall means a natural or manmade channel or pipe capable of conveying the runoff from a two-year design storm without overtopping its banks or eroding after development of the site in question.
Sec. 7.1