Purcellville, Virginia · General provision

Sec. 10.14.2(1)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Zoning permit validity period6 months

    such permit shall be valid for a period of six months

From the ordinance

No building or structure shall be erected, constructed, altered, moved, converted, extended, or enlarged, without the owner or owners first having obtained a zoning permit. Such permit shall require conformity with the provisions of this ordinance. When issued, such permit shall be valid for a period of six months unless a longer period of time is specified thereon in accord with the terms of this ordinance.
Sec. 10.14.2(1)